Wajdi TRABELSI is an assistant professor at ICN Business School and a member of the Supply Chain Management and Information Systems department since January 2014. He carries out his research activities in the LGIPM laboratory in Metz.
After obtaining an engineering degree in electromechanics and production at ENIS (Tunisia) followed by a research master’s degree in Industrialization at ENSAM in Metz, he presents his doctoral thesis on the scheduling of flexible production systems at the University of Lorraine in 2012, where he performed his Teaching and Research activities from 2009 until December 2013.
His research work concerns the development of optimization methods for supply chains and the organization of production and maintenance activities. His teaching fields are scheduling, industrial logistics, quantitative techniques and computing management.
BISTORIN, O., W. TRABELSI, “Optimiser les flux logistiques” in Management des entreprises – De l’Ă©laboration de la stratĂ©gie au dĂ©veloppement de la transversalitĂ©., C. Bertin & J. Koehl (Dir) Ed., ELLIPSES, pp. 129-140, 2023
BISTORIN, O., W. TRABELSI, “Piloter la production et la qualitĂ©” in Management des entreprises – De l’Ă©laboration de la stratĂ©gie au dĂ©veloppement de la transversalitĂ©., C. Bertin & J. Koehl (Dir) Ed., ELLIPSES, 2023
GOUIAA-MTIBAA, A., S. DELLAGI, A. CHELBI, W. TRABELSI, “Integrated Maintenance-Quality policy considering variable production cost” in CIGI Qualita MOSIM, UQTR Collection numĂ©rique, 2023, Canada
ABDERRAHMANE, F., S. BOUSLIKHANE, W. TRABELSI, Z. HAJEJ, S. DELLAGI, “Integrated Production and Maintenance Scheduling with Environmental and Operational Considerations” in Technologies and Materials for Renewable Energy, Environment and Sustainability, 2022, Metz, France
ETTAHIRY, N., W. TRABELSI, Z. CHEKOUBI, S. DELLAGI, “Optimal Management of Production and Maintenance Actions According to an Integrated Scheduling Strategy with Operational Considerations” in International Conference of Information Technologies Smart Industrial Systems, 2022, Paris, France
ABDERRAHMANE, F., S. BOUSLIKHANE, Z. HAJEJ, S. DELLAGI, W. TRABELSI, “An improved integrated maintenance/spare parts management for wind turbine systems with adopting switching concept”, Energy Reports, November 2022, vol. 8, no. 9, pp. 936-955
CHEKOUBI, Z., W. TRABELSI, N. SAUER, I. MAJDOULINE, “The Integrated Production-Inventory-Routing Problem with Reverse Logistics and Remanufacturing: A Two-Phase Decomposition Heuristic”, Sustainability , October 2022, vol. 14, no. 20, pp. 13563
CHEKOUBI, Z., N. ETTAHIRY, S. DELLAGI, W. TRABELSI, I. MAJDOULINE, “Integrated Production and Maintenance Scheduling with Environmental and Operational Considerations”, IFAC MIM, vol. 55, no. 10, pp. 1369-1374, 2022, France
JULIAN, M., S. DELLAGI, G. VOKAS, W. TRABELSI, “Energy Efficiency Improvement Potential for Sustainable Development”, American Institut of Physics Conference Proceedings, vol. 2437, no. 1, pp. 20199, 2022
CHEKOUBI, Z., W. TRABELSI, N. SAUER, I. MAJDOULINE, “A Closed-loop supply chain with remanufacturing of EOL products and environmental considerations” in PROLOG, 2021 Coauthorspresented
CHAABANE, K., J. SCHUTZ, S. DELLAGI, W. TRABELSI, “Analytical evaluation of TPM performance based on an economic criterion”, Journal of Quality in Maintenance Engineering, April 2021, vol. 27, no. 2, pp. 413-429
DELLAGI, S., W. TRABELSI, Z. HAJEJ, N. REZG, “Integrated maintenance/spare parts management for manufacturing system according to variable production rate impacting the system degradation”, Concurrent Engineering: Research and Applications, March 2020, vol. 28, no. 1, pp. 72–84
SAUVEY, C., W. TRABELSI, N. SAUER, “Mathematical Model and Evaluation Function for Conflict-free Warranted Makespan Minimization of Mixed Blocking Constraint Jobshop Problems”, Mathematics, January 2020, vol. 8, no. 1, pp. 121-139
TRABELSI, W., Z. CHEKOUBI, N. SAUER, I. MAJDOULINE, “The Integrated Production-Inventory-Routing Problem with remanufacturing under carbon cap-and-trade”, IEEE, 2020, Morocco
CHEKOUBI, Z., I.MAJDOULINE, W.TRABELSI, N.SAUER, “Logistics Distribution Routing Optimization of terroir products for solidarity shelves : A case study of a group of cooperatives and tourist establishments in rural areas of Souss Massa region” in PROLOG, 2019, Metz, France
CHEKOUBI, Z., N.SAUER, W.TRABELSI, “The Integrated Production-Inventory-Routing Problem of EOL products with simultaneous delivery and pickup” in IEEE International Conference on Advanced Logistics and Transport, 2019, Marrakech, Morocco
SAUVEY, C., W.TRABELSI, “Mathematical modelling of investment in new production means” in PROLOG, 2019, Metz, France
CHEKOUBI, Z., W.TRABELSI, N.SAUER, “The Integrated Production-Inventory-Routing problem in the context of Reverse Logistics: the case of collecting and remanufacturing of EOL products” in IEEE 4thInternational Conference on Optimization and Applications, IEEE, 2018, Mohammedia, Morocco
PACHECO OSORIO, A., C.SAUVEY, N.SAUER, W.TRABELSI, “Heuristics for hybrid flowshop problem solving with non-identical parallel machines” 7th International Conference on Industrial Engineering and Systems Management (IESM). 2017, SaarbrĂĽcken, Germany
DELLAGI, S., A.CHELBI, W.TRABELSI, “Joint integrated production-maintenance policy with production plan smoothing through production rate control”, Journal of Manufacturing Systems, January 2017, vol. 42, pp. 262-270
SAUVEY, C., N.SAUER, W.TRABELSI, “Job-shop scheduling with mixed blocking constraints between operations” in Advances in Intelligent Systems and Computing., Modelling, Computation and Optimization in Information Systems and Management Sciences (MCO), vol. 360, pp. 331-342, 2015, Metz, France
SAUVEY, C., W.TRABELSI, “Hybrid job shop scheduling with mixed blocking constraints between operations” in Emerging Technologies And Factory Automation., International Conference on
Emerging Technologies and
Factory Automation (IEEE EFTA), vol. 2, pp. 1041-1048, 2015, Luxembourg
TRABELSI, W., “Heuristiques pour le flowshop hybride avec blocage mixte” ConfĂ©rence de la SociĂ©tĂ© française de Recherche OpĂ©rationnelle et Aide Ă la DĂ©cision (ROADEF). 2013, Troyes, France
TRABELSI, W., C.SAUVEY, N.SAUER, “A genetic algorithm for hybrid flowshop problem with mixed blocking constraints” in Conference on Manufacturing Modelling, Management, and Control., IFAC MIM, 2013, Saint-Petersburg, Russia
TRABELSI, W., C.SAUVEY, N.SAUER, “Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems”, Computers and Operations Research, 2012, vol. 39, no. 11, pp. 2520-2527
TRABELSI, W., C.SAUVEY, N.SAUER, “Mathematical Model and Lower Bound for Hybrid Flowshop Problem with Mixed Blocking Constraints” in Symposium on Information Control Problems in Manufacturing., INCOM, vol. 14, pp. 1475-1480, 2012, Bucharest, Romania
TRABELSI, W., C.SAUVEY, N.SAUER, “Complexity and Mathematical Model for Flowshop Problem Subject to Different Types of Blocking Constraint” in 8th World Congress of the International Federation of Automatic Control., IFAC, vol. 18, pp. 8183-8188, 2011, Milan, Italy
TRABELSI, W., C.SAUVEY, N.SAUER, “Mathematical Model and Lower Bound for Flowshop Problem With Mixed Blocking Constraints” in Innovative Approaches and T echnologies for Networked Manufacturing Enterprises Management., Industrial Engineering and Systems Management (IESM), pp. 103-112, 2011, Metz, France
TRABELSI, W., C.SAUVEY, N.SAUER, “Heuristic Methods for problems with blocking constraints solving jobshop scheduling” in Evaluation and optimization of innovative production systems of goods and services., International Conference of Modeling and Simulation, vol. 3, pp. 1365-1373, 2010, Hammamet, Tunisia